Continued cart path addition and repaving on #4, #15 and the halfway house.

 Extension of cart path around halfway house.


New cart path addition on #15



Tuesday, December 10, 2019

Dredging of the irrigation pond to capture more depth, and allow for more available water to be utilized during irrigation.  As well as replacing the intake screen for the irrigation system.




We are also clearing brush and overgrown debris from around the irrigation pond.

Tuesday, November 26, 2019

Removing sod from #13 Black and Blue tee boxes.  In preparation for re-leveling the teeing surfaces.

Removing sod from Driving Range tee area.  In preparation for leveling and regrading of the new teeing surface.


Friday, November 22, 2019

Deep tine aerifecation on fairways, continue to promote strong root growth and displace Organic Matter build up for a more consistent playing surface.








Thursday, November 21, 2019

Busy week of Course maintenance.

Our irrigation addition has continued on hole #4 this week with 3 new irrigation heads installed to help combat the heat stress and improve turf quality along the wood line of #4 fairway.



We have also started to add sand to bunkers in need for more consistent bunkers.
 Adding Sand to multiple bunkers for improved depth.  Left Greenside bunker on #5

 Replacing old sand on Hole 18 with new sand.



New Bentgrass sod laid at the Chipping Approach.  Sod was heavily top-dressed to protect the sod through the cold winter months.

Monday, November 11, 2019

Installing additional irrigation to areas to offset stress in summer months.

Left Side of #1 Fairway


Right Side of #8 Fairway

Busy Monday, applying a light topdressing on greens to continue filling in aerification holes.

Wednesday, October 9, 2019