Wednesday, April 22, 2020

Wednesday, April 15, 2020


Today we are aerifying tees.

All playing surfaces will be complete once tees are done.

Friday, April 10, 2020

Wednesday, April 8, 2020

Friday, April 3, 2020


 The course is greening up and grass is being mowed. 



Recovering lost tee space and squaring tees to the fairway.

All fairway divots are being filled for a full recovery by the time play resumes.



New fairway contours are being aerified and seeded to bentgrass.




Friday, March 27, 2020

Work continues on the golf course.
The crew mowing fairways.


Brush is being cutback along the stream.

The crew meets outside each morning so we can keep a safe distance. Travis set up a digital job board for us to track the days work.

Friday, January 31, 2020

Drainage install on driving range.  Adding pea-gravel and drainage pipe to facilitate water movement through the soil profile and out of the teeing area.




Monday, January 13, 2020

Spreading High Cal Lime, course wide to raise pH levels in the soil.  The application of High Cal Lime will help our soil become more neutral on the pH scale, promoting beneficial growing conditions.


Monday, January 6, 2020

Topdressing greens in anticipation of rain.  Topdressing during this time of year is very important to plant health and play-ability come the growing season.  The sand particles will protect the crown of the plant from the ever changing winter temperatures, this allows for a more healthy plant in the spring time.  It also helps to reduce thatch buildup and puffiness, creating firm conditions in the summer.