Nearing the halfway point
Friday, October 29, 2021
Hole 11 Nearing Completion
Hole 11 is nearing completion after drainage was finished in the right green side bunker and a majority of the disturbed area was sodded yesterday.
The sandy areas on the players left, right and front of the green, as seen in the overhead picture, are newly contoured areas. Over time, sand accumulation from bunker shots builds up and raises the putting surface. In these areas, the green was lowered as much as 8 inches to recapture the natural contours of the putting surface.
A greens expansion was also completed in the back of this green. Increasing the cupping space on a green that has a limited number of pin placements.
Monday, October 25, 2021
15 Green Before/After
Thursday, October 21, 2021
Better Billy Bunker Liner
Several holes have been completed with sod. Pictured above is the front right bunker on 9 green being sprayed with the Better Billy Bunker polymer. Once this has cured these holes will be finished with the addition of bunker sand.
9 Green Sodding
Friday, October 8, 2021
Work at 15 Continues
With holes 13 and 14 ready for final prepping and sod, we continue to work on 15 green and it’s surround. In order to recapture the natural flow of the land and a classic Donald Ross look, we have spent a great deal of time on this hole to perfect our process moving forward.
Friday, October 1, 2021
Bunker Project Begins
This week we began the demolition of our old bunkers. This includes removal of sand, old liner and drainage pipe from the existing bunkers. As well as stripping sod around the existing bunkers for regrading purposes.